ClientMark Hall Specialist Sports College, Harlow

Services Provided Re-design and Reconstruction of existing Athletics track infield

Turfdry had already carried out numerous successful projects for Essex County Council (value around £500k) before being asked, in 2007, to look at problems with an existing athletics infield at Mark Hall Specialist Sports College, Harlow, which had been poorly constructed and was prone to serious waterlogging.

Turfdry’s proposals involved ripping up the existing surface and importing 1,500 tonnes of new topsoil to enable improved surface gradients to be achieved, prior to the installation of a new Turfdry Drainage System with Hydraway Sportsdrain at 2.5 metre centres.

Due to the need to get the facility back into play in the shortest time possible the field was then re-turfed in February 2008, rather than re-seeded, and was back in use two months later.

Testimonial

Pete Summers (Senior Procurement Consultant), who supervised the contract for Essex County Council commented:

"I have worked with Turfdry Ltd for the past five years and found the service provided to be of a very high and professional quality. Their attention to detail, approach to problem solving, and reliability has been very good. I wouldn’t hesitate to use this company again in the future".

 

Serious Waterlogging
Original site - Serious Waterlogging
Poor quality weed-infested sward
Original Site - Poor Quality Weed-infested Sward
1500 tonnes of soil imported and laser-graded to create suitable falls
1500 Tonnes of Soil Imported and Laser-graded to Create Suitable Falls
Turfdry Drainage System installed with Hydraway Sportsdrain at 2.5 metre centres
Turfdry Drainage System Installed with Hydraway Sportsdrain at 2.5 metre Centres
Cultivations
Cultivations
Laying big roll Rolawn Medallion Turf – February 2008
Laying "big roll" Rolawn Medallion Turf – February 2008
Completed project - April 2008
Completed Project - April 2008
Completed project - April 2008
Completed Project - April 2008